Step 4: Configure the Number of Jobs to Run on the PM Compass Process Server
To configure the number of jobs to run on the PM Compass Process server, you must create the Cobra Queue in EPM SA, specify the maximum number of jobs for the Cobra queue in the Maximum field, and make sure that the Max Concurrent Jobs field in the EPM SA Weblink Utility is set to the Maximum field value.
Perform this procedure on the Cobra Concurrency machine where PM Compass and Cobra are installed.
- Create the Cobra Queue in EPM SA and check the Max Concurrent Jobs field in EPM SA Weblink Utility.
- Related Topics:
- Create the Cobra Queue in EPM SA and Check the Max Concurrent Jobs Field in EPM SA Weblink Utility
You must perform this procedure on the Cobra Concurrency machine where PM Compass and Cobra are installed.
Parent Topic: Implementing Concurrency